Gypsum adhesive P2 for fixing of plasterboard and plaster panels.

Dry building compound for indoor application for fixing of plasterboard and plaster panels.

Application:
- The surface on which it will be applied has to be stable, solid and dry and without any paint, coating or other impurities and remains.
- Stir 1.5 – 2 weight parts of the compound with 1 weight part of pure water in a plastic container. Stir with a low-rotating stirrer for 2 – 3 minutes. Wait for 5 minutes and then stir the mixture again until it becomes homogeneous. The prepared in this way mixture will not harden for 45 – 90 minutes. Apply if the air temperature is between 50С and 300С. If possible, use an electric stirrer.
- The mixture will not harden for about 1 ½ hours.
- Excellent cohesion with the ground surface, plasticity and strength.

Technical specifications

Compressive strength ≥2.0 N/mm²
Adhesive tensile strength ≥0.06 N/mm²
Open time for work ≥ 60 min
Form of delivery ≥ 60 min
Consumption allowance 1.0 kg/m² for 1.0 mm layer
Bending tensile strength ≥1.0 N/mm²
Reaction to fire Class A1 non - flammable
Packaging mulilayer paper bag